1. Productive time(hr)
Analysis output
Industry hourly Capacity :- 10.00 hr/24hr.
Industry intensivity (machin to worker) :- 1 : 5.
Industry classifed as Labour Intensiv.
key intervention areas.
- Limited domestic and export market integration.
- weak product branding.
- High collateral requirements.
- limited risk appetite of lenders.
- weak institutional mechanisms for SMI’s finance.
2. Machine efficiency
Analysis output
Overall Equipment Effectiveness (OEE) :- 84%.
Design standard allowed minutes :- 0.14 min
/Pcs
Actual standard allowed minutes :- 0.14 min
/Pcs
key intervention areas.
- Limited uptake of industrial technology and innovations among SMI’s .
- weak linkages between research, enterprise, and technical institutions.
- Low integration of green technologies.
- weak gender and youth inclusion.
- limited social impact orientation.
3. Attainable Amount
Analysis output
Attainable Capacity :- 4,286
Pcs
company efficiency :- 88.0 %
key intervention areas.
- High input-output inefficiency.
- lack of process control.
- poor quality assurance.
- limited adoption of local and global standards.
- Labor inefficiency.
- poor process optimization.
- inconsistent quality outputs.
- Skills mismatch.
- limited exposure to modern industrial practices.
- weak vocational-industry linkages.
4. Capacity Utilization
Analysis output
Capacity utilization :- 81.66%
Industry produces :- -786
Pcs
less products than its attainable
key intervention areas.
- Lack of affordable infrastructure.
- limited access to utilities.
- inadequate industrial workspace.
- Fragmented institutional mandates.
- duplication of functions.
- low institutional efficiency.
- lack of integrated SMI support.
- weak decentralized service delivery systems.